Building works on Level 3

Commencing Friday 4 September until Wednesday 9 September, there will be extensiveÌýelectrical work undertaken in the Level 3 Barr Smith LibraryÌý24-hour space to install new lighting. Therefore, part of the floor will be cordoned off and inaccessible during this period.ÌýThe High Use CollectionÌýand seating in the front area of the space are still accessible 24/7 (with swipe card access requiredÌýafter hours). Access is also still available for the lift and all northern stairwells.Ìý

Thank you for your patience during this time.Ìý

Tagged in building works, building access
Ìý